Has anyone had this problem? This box we have has a job set to backup about 4.22 GB onto a DVD+RW daily. it has 512MB of RAM and the max. VM size is around 600MB yet currently at 200-something MB. In the course of a backup job, Windows sometimes was saying (before increasing the RAM to 512) the VM had to be increased, now with 512 I'm not sure why it needs to up the VM, but it gave the message on the last backup job. That job then hangs (it does not fail) forever until you close BackItUp or delete/re-create the job. Can someone help? thanks, Chip Zoller