UnleashX change order of Menu

Discussion in 'Xbox - Software discussion' started by Phyxe, Feb 19, 2006.

  1. Phyxe

    Phyxe Member

    Joined:
    Feb 15, 2006
    Messages:
    2
    Likes Received:
    0
    Trophy Points:
    11
    Hi,

    after sucessfully installing the UnleashX Dashboard with the help of the SID 2.0 I have about 15 different choices in my XBOX Main menu. The first on is Restore MS Backup and somewhere at the very bottom it says launch dvd. I want to know whether there is the possibility of rearranging the Menu Points, so that I don't have to Scroll all the Way down just to Start a Game.

    I hope you can help me,
    Thx A Lot, Jochen
     
  2. theridges

    theridges Guest

    mine is at the very top,you should be able to change that in the .xml file which should be in the same directory of the unleash.xbe
     

Share This Page